Plans define the scope
Share slab details, loading requirements and specified tolerances. Reinforcement, vapor barriers, joints and embedded items should be resolved before placement. Finishing requirements vary with the building use and any flooring system that will cover the slab.
Sequence the work
Discuss access for delivery, placement areas, inspections and the schedule for following trades. A proposal should identify responsibilities and exclusions clearly. Call with the project location and drawings so JD can review the scope rather than applying residential estimator assumptions.