Replacing the driveway as a whole
The walkthrough should establish which concrete comes out, how debris leaves the property and whether the base needs correction. Garage transitions, sidewalks and drainage paths affect the layout. Describe any standing water or settling so those concerns can be considered before the new concrete is placed.
Access while work is underway
Plan where vehicles will park during removal, construction and curing. Tell JD about deliveries, shared access and any vehicles heavier than a typical passenger car. Final thickness, reinforcement and the return-to-use schedule depend on the agreed design and site conditions.
